The Challenge
The existing plant room at St James Court had reached the end of its serviceable life, resulting in increased downtime to heating and hot water services and reduced overall system efficiency and reliability.
As the plant served 19 residential flats, maintaining heating and hot water throughout the colder period was essential. The restricted size of the plant room also presented installation challenges, requiring careful planning and sequencing to minimise disruption and keep the final changeover shutdown period as short as possible.
Our Solution
Prestige delivered a complete plant room refurbishment while working under CDM Regulations, carefully coordinating the works around the continued operation of the residential development.
The existing plant was replaced with two new Ideal Evomax boilers providing a combined output of 160kW, together with plate separation and communal hot water provision. Prestige completed the full mechanical and electrical installation, including associated plant, pipework and controls, alongside a new BMS upgrade to improve system control, monitoring and ongoing performance.
A chemical-free Elexion water treatment solution was also installed to support system protection, water quality and long-term performance without the need for traditional chemical dosing.
The Result
Heating and hot water services were maintained throughout the works, with the final changeover to the new plant carefully managed through a short shutdown period to minimise disruption to residents.
The completed refurbishment provides St James Court with a modern, reliable and more efficient heating and hot water system serving all 19 flats. The new installation was fully commissioned and handed over, providing improved system performance, enhanced control and a more maintainable plant room designed to support the long-term operation of the development.
“The project was completed to a high standard by contractors Prestige Plant Room Services Ltd, meeting all quality, programme, and budget requirements. Effective project planning, contractor management, and stakeholder engagement ensured that works were delivered safely and efficiently, with no safety incidents or concerns throughout the delivery phase.”