Case Study

Waterfront / 55 Degrees North, Edinburgh

Sector
Residential
Location
Edinburgh
units
101
Service
Energy Centre Refurbishment

The Challenge

The existing heating plant serving Waterfront / 55 Degrees North in Edinburgh had reached the point of failure, leaving the development at risk of losing essential heating and hot water services.

As an occupied residential development with a diverse resident population, including elderly and vulnerable residents, maintaining uninterrupted services throughout the project was a key priority. Before replacement works could begin, Prestige was required to quickly implement a temporary boiler solution to restore and maintain heating and hot water across the development.

Further challenges included restricted site access, with the external energy centre located within the middle of the residential complex, creating logistical difficulties for material deliveries, plant replacement and specialist lifting operations.

Working against a tight six-week programme, it was critical that the temporary system remained operational whilst the permanent energy centre replacement was completed as safely and efficiently as possible.

Our Solution

Prestige Plant Room Services Ltd was appointed as Principal Contractor and took full responsibility for the planning, management and delivery of the works in accordance with CDM Regulations. The project commenced with the installation of temporary boiler plant to ensure uninterrupted heating and hot water services for residents throughout the refurbishment programme.

To minimise time on site and reduce disruption within the occupied development, significant sections of pipework were prefabricated at Prestige’s off-site fabrication facility before being delivered to site ready for installation. The refurbishment involved the removal of the existing primary plant and associated pipework, followed by the installation of three Ideal Imax Extra boilers, providing a total output of 1410kW.

The energy centre also included a plate heat exchanger, new pumps and associated mechanical and electrical infrastructure upgrades. Specialist flue contractor Flue Stax delivered and installed the new flue system, while electrical upgrades were undertaken to support the new plant installation, controls, and commissioning requirements. All installation, testing and commissioning works were completed in accordance with relevant industry standards, ensuring a safe, reliable and efficient heating solution for the development.

The Result

The project was successfully completed within the programme period whilst maintaining heating and hot water services for residents throughout the works. The energy centre now provides a modern, reliable and efficient heating solution designed to support the development for years to come. Through careful planning, temporary services provision and the use of off-site fabrication, Prestige successfully minimised disruption to residents and delivered a smooth transition from the temporary installation to the permanent plant room solution.

The completed project demonstrates Prestige’s expertise in delivering complex occupied residential plant room refurbishments where service continuity, resident communication and programme management are critical to success.

Services Delivered

Principal Contractor Duties Temporary Boiler Installation Plant Room Refurbishment Commercial Boiler Installation Mechanical Services Installation Off-Site Pipework Fabrication Flue Installation Electrical Works Commissioning & Testing Resident Liaison & Service Continuity Management